160mm hot melt hydraulic butt welding machine supply needs to be connected to a water chiller or a self-made water pump type tank before use, so that the cold water circulates away heat and increases the life of the welding machine. Then we need to know how to connect the water pipe
1. Connect the cooling water to the "water inlet" connector at the lower right side of the equipment
2. The "water outlet" joint is led to the cooling water tank for circulating cooling.
3. The main components inside the equipment are water-cooled, and cooling water must be supplied before use, otherwise the equipment will be damaged due to overheating if it is used for a long time.
4. The cooling water must be clean neutral water (tap water), and other water such as turbid river water or well water with high pH value cannot be used. Otherwise, pipeline blockage, corrosion, water leakage and other failures are likely to occur.
5. When the equipment is used in cold weather, the accumulated water inside the equipment must be drained, otherwise it is easy to freeze the cooling water pipe of the equipment. Compressed air can be used to blow the accumulated water out of the water inlet.
160mm hot melt hydraulic butt welding machine supply https://www.dowelding.com/20mm-315mm-heavy-duty-electrofusion-welding-machine.html